Canopy repair works to make the structure safe, stabilise it, and deliver a long-term solution improving durability and performance.

Project Overview

The canopy repair works at Teknicon House were carried out to make the structure safe, stabilise it in the short term, and deliver a long-term solution that improves durability and performance. The first priority was safety. We installed 20nr super props (two per column), securely resin-anchored into the ground to provide immediate support to the canopy. At the same time, 336m of debris netting was fitted beneath the structure to catch any loose material and reduce risk to the surrounding area. Due to the height and uneven ground conditions, all works were undertaken using diesel scissor lifts to ensure safe and controlled access. With the structure stabilised, we progressed to the permanent works. This included the replacement of 452nr anti-sag tie bars on a like-for-like basis, along with the careful removal and reinstallation of the existing fascia panels. In addition, the original steel columns were removed and replaced with new galvanised columns, designed to improve longevity. These were detailed with isolation pads at the base to prevent water ingress and reduce the risk of future corrosion.

A well-managed and methodical approach to a complex remediation package. The team at G&H Steel prioritised safety throughout and delivered a durable, long-term solution with minimal disruption to the site.

RDC Trading

Client

Project Gallery